silent valley cafe
Breakfast
Cafe
Cheap Eats
Highchairs Available
Lunch
Restaurants
Seating
Takeout
Restaurant
About
The restaurant and information centre are reached by paths leading to the left. At the parapet turn left to cross the width of the dam. Work on the dam began in 1932 and was finished ten years later. It is of earth and rock construction, and captures the waters of the Kilkeel River valley and the Annalong River valley to the east via a 3.6 km tunnel under Slieve Binnian, the rocky, crested mountain to the east (right).
At a glance
- Typical visit: about 1 hour